Day 1 :A. DEFINITION
Historical aspects
Mobile platforms
Fixed platforms: GBS and jacket
Classification
Films: Troll, Frigg, Dunbar
Day 2 :
B. DESIGN
Loads
Basic design
Additional checks
Multidiscipline design
C. FABRICATION
Steel (high strength steel, brittle fracture)
Nodes (rolled plate nodes, casted nodes)
Assembly (skidding beams, roll-up and bottles)
Load out (with or without the tide, sea-fastening)
Film: North cormorant
Day 3 :
D. INSTALLATION: JACKET
Transport and sea-fastening
Launching (launching barge, rocker arm, positioning)
Lifting (lifting barge, maximum lifting weight)
Foundations (pile installation driven pile insert pile bucket foundation)
Film: Virgo
Day 4 :
E. INSTALLATION: TOPSIDES
Modules (small and large)
Hook-up and commissioning
Integrated deck
Installation inshore on GBS: mating
Installation offshore: lifting, mating, float over
Films: Amenam, Troll, Sakhalin, Dunbar
Day 5 :
EXAM
RESULTS
Quick overlook on deep offshore
Films: Dalia Pazflor & Matterhorn
Language
Français & Anglais
Audience type
Bachelor/Master students in petroleum engineering or civil engineering or mechanical engineering.
Planned duration
5 days x 3 1/2 hours but duration could be tailored to meet students levels and/or University program. Films will be shown, at each lecture.
Support material
Paper booklet with a selection of the main / Slides in English (Slides in Russian available)
Prerequisite
none
Objectives
To acquire technical and practical knowledge on platforms and pipelines designed and installed on conventional offshore (water depth between and 5 meters)