Language: English
Planned duration: From 1 to 3 hours, adaptable
Work with Total 1976 / 2016
Project Manager Bonkot Phase 3 (Thailand) (96 / 98) / Pumping operation and cargo recovery from the ERIKA wreck (2000)
Asset Manager d’AKPO (Nigeria / Phase Pre project et Basic engineering) (2001/ 2003)
Bloc 17 Director in Angola (2004 / 2007)
Vice president Technology Operation and Project for New Energies (2009/ 2015)
Ingénieur civil des mines de Paris
Oil &Gas development (conception, engineering)
Project Management
Asset Management
New Energies (solar & biotechs)